Cabot, AR · Lonoke County
Cabot Residential Addition or Remodel Permit Fees and Submittal Checklist
An addition to, or alteration of, an existing one- or two-family dwelling.
Cabot Fee Estimate
Fee Estimate
Permit valuation may differ from your construction budget when the city applies its own valuation method.
Estimate · Cabot, AR
Unavailable
Cabot does not publish this fee schedule. Known fees below total $0.00. Call (501) 843-4819 for a quote.
- Building permit feeUnavailable
Cabot calculates building fees at plan review and does not publish its fee schedule. Call the permit office for a quote.
- Plan review feeUnavailable
Cabot does not publish a plan review fee.
Not included in this estimate
Trade permits (electrical, plumbing, mechanical); utility tap and impact fees, re-inspection fees, and other agency approvals.
Need sealed MEP drawings, permit expediting, or 3 bids from ACLB-licensed contractors in Cabot?
Common Project Values
Estimated Cabot fees for residential addition or remodel projects at six standard sizes, computed with the same rules as the calculator. Trade permits excluded.
Bath or porch
$25,000 · 200 sq ft
Unavailable
Single room
$50,000 · 400 sq ft
Unavailable
Primary suite
$90,000 · 600 sq ft
Unavailable
Two-room addition
$150,000 · 900 sq ft
Unavailable
Second story
$250,000 · 1,400 sq ft
Unavailable
Whole-house remodel
$400,000 · 2,500 sq ft
Unavailable
| Project size | Valuation | Area | Permit fee | Other fees | Estimate |
|---|---|---|---|---|---|
| Bath or porch | $25,000 | 200 sq ft | Unavailable | $0.00 | Unavailable |
| Single room | $50,000 | 400 sq ft | Unavailable | $0.00 | Unavailable |
| Primary suite | $90,000 | 600 sq ft | Unavailable | $0.00 | Unavailable |
| Two-room addition | $150,000 | 900 sq ft | Unavailable | $0.00 | Unavailable |
| Second story | $250,000 | 1,400 sq ft | Unavailable | $0.00 | Unavailable |
| Whole-house remodel | $400,000 | 2,500 sq ft | Unavailable | $0.00 | Unavailable |
Central Arkansas Cost Comparison
The same project priced in all eight cities. Valuation-based cities (fee grows with project cost) and square-footage cities (fee grows with floor area) can differ widely for the same building. Full comparison →
Residential Addition or Remodel: $90,000, 600 sq ft. Trade permits excluded.
- Little Rock$415.75Valuation tiers
$250.00 for first $50,000.00 + 40 × $3.50 per additional $1,000.00
- North Little Rock$120.00Sq ft + valuation
600 sq ft × $0.20 = $120.00
- Conway$91.00Sq ft + valuation
600 sq ft × $0.11 = $66.00
- Bryant$100.00Square footage
600 sq ft × $0.14 = $84.00; minimum $100.00 applies
- Benton$60.00Square footagelowest
600 sq ft × $0.10 = $60.00
- Maumelle$114.00Sq ft + valuation
600 sq ft × $0.19 = $114.00
- SherwoodUnavailableSquare footage
Sherwood adopted its building fee schedule by reference (Ord. 1599) and does not publish it. Only the new-home rate is codified.
- CabotUnavailableNot published
Cabot calculates building fees at plan review and does not publish its fee schedule. Call the permit office for a quote.
| City | Fee basis | Why it differs | Permit fee | Estimate |
|---|---|---|---|---|
| Little RockPulaski County | Valuation tiers | $250.00 for first $50,000.00 + 40 × $3.50 per additional $1,000.00 | $390.00 | $415.75 |
| North Little RockPulaski County | Sq ft + valuation | 600 sq ft × $0.20 = $120.00 | $120.00 | $120.00 |
| ConwayFaulkner County | Sq ft + valuation | 600 sq ft × $0.11 = $66.00 | $66.00 | $91.00 |
| BryantSaline County | Square footage | 600 sq ft × $0.14 = $84.00; minimum $100.00 applies | $100.00 | $100.00 |
| BentonSaline County | Square footage | 600 sq ft × $0.10 = $60.00 | $60.00 | $60.00lowest |
| MaumellePulaski County | Sq ft + valuation | 600 sq ft × $0.19 = $114.00 | $114.00 | $114.00 |
| SherwoodPulaski County | Square footage | Sherwood adopted its building fee schedule by reference (Ord. 1599) and does not publish it. Only the new-home rate is codified. | Unavailable | Unavailable |
| CabotLonoke County | Not published | Cabot calculates building fees at plan review and does not publish its fee schedule. Call the permit office for a quote. | Unavailable | Unavailable |
Cabot Submittal Checklist
Required and conditional documents for this project type. Confirm this requirement with the city.
Cabot permit application
Submit through Cabot Planning & Zoning / Public Works. Include the project address, parcel number, owner, contractor and declared valuation.
Permit portal ↗Construction drawings
Floor plan, foundation plan, wall section and elevations. Plans for one- and two-family dwellings generally do not require an architect's seal.
Site plan or survey
Property lines, setbacks, easements, building footprint, driveways and drainage. New commercial sites usually go through planning or site plan review first.
Energy code compliance
REScheck or equivalent showing compliance with the Arkansas Energy Code for the dwelling envelope.
Arkansas energy code status ↗Arkansas contractor license verification
Residential projects over $2,000 need an ACLB residential builder or home improvement license, unless the owner is building their own home.
ACLB license lookup ↗Trade permits from licensed trades
Electrical, plumbing and mechanical permits are pulled separately by Arkansas-licensed master electricians, plumbers and HVACR contractors.
Permit office
Cabot Planning & Zoning / Public Works
- 1 City Plaza, Suite A, Cabot, AR 72023
- (501) 843-4819
- Online permit portal · Department website
Confirm hours and submittal format with the city before you go.
Inspection Roadmap
- 1
Footing
After trenches are dug and steel is placed, before concrete
- 2
Foundation / slab
After under-slab plumbing, vapor barrier and steel, before the pour
- 3
Rough-in: plumbing, electrical, mechanical
After rough trade work, before walls are covered
- 4
Framing
After rough-ins pass, before insulation
- 5
Insulation / energy
After insulation, before drywall
- 6
Trade finals
Electrical, plumbing and mechanical finals
- 7
Building final
After all trade finals pass
Frequently Asked Questions
How much does a residential addition or remodel permit cost in Cabot, Arkansas?
Cabot, AR does not publish the building permit fee for a $90,000 (600 sq ft) residential addition or remodel in a form PermitBasis can confirm, so no total is estimated. Call Cabot Planning & Zoning / Public Works at (501) 843-4819 for a quote.
Does Cabot, AR calculate building permits by square footage or project valuation?
Cabot's Unified Development Code refers to a building permit fee schedule that the city does not publish; fees are calculated during plan review. PermitBasis shows Cabot fees as unavailable rather than estimating them.
How long does commercial plan review take in Cabot, AR and what does it cost?
Cabot does not publish a plan review fee. The city does not publish a plan review turnaround time; ask the permit desk for the current queue when you submit.
Do I need an Arkansas commercial contractor license to pull a permit in Cabot?
Yes, for commercial work of $50,000 or more. Under A.C.A. § 17-25-101, any project other than a single-family residence costing $50,000 or more in labor and materials requires an Arkansas Contractors Licensing Board commercial license, and the building official must see proof of license before issuing the permit. Residential builders and remodelers need an ACLB residential license for jobs over $2,000. Splitting a contract to stay under a threshold is not allowed. Licensed electricians, plumbers and HVACR contractors pull their own trade permits in Cabot.
Sources and Assumptions
- Schedule
- Cabot building permit fee schedule (not published online)
- Source reviewed on
- October 20, 2026
- Data status
- The published schedule could not be confirmed. Totals are partial until it is.
- Cabot Administrative Guidelines for Residential Constructionreviewed 2026-10-20
- City of Cabot permit FAQreviewed 2026-10-20
- A.C.A. § 6-55-106 (Act 474 of 1999)reviewed 2026-10-20
- The only published building fees are a $40 re-inspection fee (due before the certificate of occupancy) and a $120 solar panel permit.
PermitBasis is an independent planning resource. The issuing authority determines final fees and requirements.