Skip to content
PermitBasis

Conway, AR · Faulkner County

Conway HVAC / Mechanical Replacement Permit Fees and Submittal Checklist

Replacement of heating, cooling or ventilation equipment. Usually a mechanical permit only, with no building permit.

01

Conway Fee Estimate

Fee Estimate

$

Permit valuation may differ from your construction budget when the city applies its own valuation method.

sq ft

Estimate · Conway, AR

$65.00

Estimated fees for the inputs shown. Conditional items are listed but not added.

Cost of working without a permit in Conway: $130.00Permit fees are multiplied by 2× when work starts before the permit is issued.

Need sealed MEP drawings, permit expediting, or 3 bids from ACLB-licensed contractors in Conway?

Sources and Assumptions

Schedule
Conway Code § 11.16.06 (Ord. O-25-03)
Source reviewed on
October 20, 2026
Assumes
Commercial occupancy; $50,000 valuation and 4,000 sq ft as entered.

PermitBasis is an independent planning resource. The issuing authority determines final fees and requirements.

02

Common Project Values

Estimated Conway fees for hvac / mechanical replacement projects at six standard sizes, computed with the same rules as the calculator. Trade permits excluded.

  • Single split system

    $12,000 · 1,800 sq ft

    Mechanical fee $65.00

    $65.00

  • Two-system home

    $25,000 · 3,000 sq ft

    Mechanical fee $65.00

    $65.00

  • Small RTU

    $50,000 · 4,000 sq ft

    Mechanical fee $65.00

    $65.00

  • Multiple RTUs

    $150,000 · 12,000 sq ft

    Mechanical fee $65.00

    $65.00

  • Chiller / VRF

    $400,000 · 30,000 sq ft

    Mechanical fee $65.00

    $65.00

  • Central plant

    $900,000 · 50,000 sq ft

    Mechanical fee $65.00

    $65.00

03

Central Arkansas Cost Comparison

The same project priced in all eight cities. Valuation-based cities (fee grows with project cost) and square-footage cities (fee grows with floor area) can differ widely for the same building. Full comparison →

04

Conway Submittal Checklist

Required and conditional documents for this project type. Confirm this requirement with the city.

Submittal Checklist0 of 5 ready
  1. Conway permit application

    Submit through Conway Building Permits & Inspections. Include the project address, parcel number, owner, contractor and declared valuation.

    Permit portal ↗
  2. Licensed HVACR contractor

    Mechanical permits are pulled by an HVACR contractor licensed by the Arkansas Department of Health HVACR Licensing Board, or by a homeowner for their own residence where the city allows it.

    ADH HVACR licensing ↗
  3. Equipment schedule

    Make, model, tonnage or BTU rating and efficiency for each unit being replaced or added.

  4. Structural letter for rooftop units

    Conditional

    When a new rooftop unit is heavier than the one it replaces or sits in a new location, a structural evaluation is usually required.

    Applies when: Rooftop equipment changes weight or location

  5. Electrical permit for new circuits

    Conditional

    A separate electrical permit is required when the replacement needs a new circuit, disconnect or panel work.

    Applies when: New circuit, disconnect or panel work

Permit office

Conway Building Permits & Inspections

Confirm hours and submittal format with the city before you go.

Inspection Roadmap

  1. 1

    Mechanical final

    After equipment is set, connected and operating

  2. 2

    Electrical final

    Conditional

    After new circuits or disconnects are complete

    Only with an electrical permit

05

Frequently Asked Questions

How much does a hvac / mechanical replacement permit cost in Conway, Arkansas?

Under Conway Code § 11.16.06 (Ord. O-25-03), a $50,000 (4,000 sq ft) hvac / mechanical replacement in Conway, AR has estimated permit fees of $65.00. This includes a $65.00 mechanical permit fee. Trade permits are billed separately.

Does Conway, AR calculate building permits by square footage or project valuation?

Conway prices new construction and additions by square footage under roof ($0.11 residential, $0.14 commercial) and remodels by valuation ($1.00 per $1,000). Electrical, plumbing and mechanical permits pulled with a building permit are a percentage of the building fee: 47% residential, 35% commercial, per trade.

How long does commercial plan review take in Conway, AR and what does it cost?

Plan review is a flat $25.00 for residential and commercial projects. The city does not publish a plan review turnaround time; ask the permit desk for the current queue when you submit.

Do I need an Arkansas commercial contractor license to pull a permit in Conway?

Yes, for commercial work of $50,000 or more. Under A.C.A. § 17-25-101, any project other than a single-family residence costing $50,000 or more in labor and materials requires an Arkansas Contractors Licensing Board commercial license, and the building official must see proof of license before issuing the permit. Residential builders and remodelers need an ACLB residential license for jobs over $2,000. Splitting a contract to stay under a threshold is not allowed. Licensed electricians, plumbers and HVACR contractors pull their own trade permits in Conway.

06

Sources and Assumptions

Schedule
Conway Code § 11.16.06 (Ord. O-25-03)
Source reviewed on
October 20, 2026
Data status
Fee schedule reviewed against the city's published source.

PermitBasis is an independent planning resource. The issuing authority determines final fees and requirements.